The Past
The Bull Run powerhouse (right) and the transformer building (left) were completed in 1912.
The Bull Run powerhouse (right) and the transformer building (left) were completed in 1912.

(continued from previous page)
while using only a fraction of the Sandy River's normal water flow. This required construction of a series of canals and tunnels to combine the water of the Sandy with that of the Little Sandy River and get it to the powerhouse, completed in 1912.

Since that time, Marmot Dam has enjoyed regular upgrades and enhancements. Many, like the fish screens added in 1951, were designed to improve the migration success of salmon and steelhead. In 1989, the original timber structure was replaced with concrete.

 Previous  
Page 2 of 2
  Next > 
Page: The Past       Section: The Plan
       
Photos
Historical photos of the Bull Run Project
view photos Historical photos of the Bull Run Project  
Videos
Overview of the dam removal project
view video Overview of the dam
removal project
 
view video Overview of the Coffer dam construction